top of page

Our Work
Below is a selection from our portfolio. Projects that we have been proud to work on and that we look back on with pleasure.

Aan de bak - Demolition

Aan de bak - Demolition

Aan de bak - Demolition

Aan de bak - Demolition
1/4
Demolition work 300m2 living space
A large project involving a three-story house that needed to be completely stripped. Removal of walls, floors, ceilings, as well as cables and pipes.

Aan de bak - Paintwork

Aan de bak - Paintwork

Aan de bak - Paintwork

Aan de bak - Paintwork
1/5
Painting & Repairs
For this painting job, we created an opening for the washing machine and painted all the walls in the house. The house was in poor condition, so we had to carry out many small repairs beforehand. After thorough preparation, everything was finished neatly.

Aan de bak - Paintwork

Aan de bak - Paintwork

Aan de bak - Paintwork

Aan de bak - Paintwork
1/4
Painting job 9 frames (outside/inside)
This project in Amsterdam took a week, during which we had to paint 9 window frames, both inside and outside. First we removed the imperfections and any damage and then we applied several layers of paint.

Aan de bak - Carpentry

Aan de bak - Carpentry

Aan de bak - Carpentry

Aan de bak - Carpentry
1/4
Carpentry protective walls
In hotel corridors where the walls were frequently damaged due to heavy use, we installed durable protective walls. This solution ensures a neat and well-maintained appearance, even with daily use.
​

Aan de bak - Paintwork

Aan de bak - Paintwork

Aan de bak - Paintwork

Aan de bak - Paintwork
1/5
Painting door frames
Here is a selection of our painting work on door frames over the past period. The wishes were different, but we found the right solution for every issue.

Aan de bak - Demolition

Aan de bak - Demolition

Aan de bak - Demolition

Aan de bak - Demolition
1/3
Casco Demolition
This project in Amsterdam lasted a week, during which we were allowed to demolish the floor, kitchen and bathroom from the house. We also helped with the next steps of the renovation of the house.

Aan de bak - Plastering

Aan de bak - Plastering

Aan de bak - Plastering

Aan de bak - Plastering
1/4
Demolition, Plastering, Painting
The images are in chronological order. The customer wanted to have the stone wall removed and turn it into a smooth wall. We started to remove the glued stones with a demolition hammer. We then filled the holes up and plastered the wall. After drying we painted the wall.

Aan de bak - Badkamer renovation

Aan de bak - Badkamer renovation

Aan de bak - Badkamer renovation
1/2
Bathroom Renovation
The images are in chronological order. We completely stripped the bathroom. We then placed 90x90 tiles in the bathroom and installed a Geberit toilet.
bottom of page